Driven piles are installed by transferring hammer energy into the pile. Driving records show penetration per blow or blows per increment and tie the response to hammer settings, splices and changes in soil. The same blow count can reflect different resistance when hammer or cushion performance changes.
Check installation and resistance together
Use wave-equation analysis or dynamic measurements to interpret drivability and pile stresses within the project approach. A restrike can help assess time-dependent changes after installation where appropriate. Track heave, damage and deviations across the group. Compare field observations with the ground model and use the specified verification program to support acceptance.
Why can pile resistance change after driving?
Installation disturbs the ground and can generate excess pore pressure. Resistance may change as the soil recovers, depending on material and installation conditions.
References
- FHWA — Structural Foundations (GEC collection)
- FHWA — Design and Construction of Driven Pile Foundations, Vol. II