Skip to content
SOILIUM

Retaining walls and excavations · 1 min read

Secant vs Contiguous Pile Walls for Excavation

A secant pile wall uses overlapping bored piles to form a more continuous barrier.

Indonesian version

A secant pile wall uses overlapping bored piles to form a more continuous barrier. A contiguous pile wall uses closely spaced piles with gaps, generally where inflow through the gaps can be managed. Both systems can retain ground when designed for the site and support sequence.

Compare tolerances and groundwater demands

Look at the required overlap at depth, pile verticality and interruptions at corners. The groundwater performance of a secant wall depends on actual continuity and ground conditions. For a contiguous wall, review whether seepage through gaps could transport soil or affect adjoining assets. Check the detailed construction sequence and any supplemental facing, sealing or drainage.

What should be checked at a secant wall joint?

Review as-built position, verticality, overlap and evidence of leakage or soil transport, especially where the water head difference peaks.

References

Related articles