A trigger action response plan defines what to do when measured behavior reaches specified conditions. Triggers can use displacement, rate of movement, pore pressure or combinations. Thresholds should allow time to confirm a reading and act before an unacceptable condition develops.
Make each trigger actionable
Tie levels to an observable quantity, an accountable role and a response deadline. State how the team handles a failed sensor and who can resume work after escalation. Include checks for abrupt jumps, sustained trends and independent corroboration. Test an example with the field team to see whether the planned action can be performed within the available time.
Can a trigger use movement rate rather than total movement?
Yes. Rate can reveal acceleration while total movement is still small. Select the averaging interval and sensor precision to suit the intended warning.
References
- USACE — Dam Safety Engineering Manuals, including EM 1110-2-1908 on instrumentation
- Peck (1969) — Advantages and Limitations of the Observational Method in Applied Soil Mechanics